20160713 002
20160713 009
20160713 014
20160713 021
20160713 028
20160713 044

Job Description:

  • Vacuum sewer system upgrade for Melbourne water head office
  • Green/eco project, water saving
  • Additional of extra pump, integration into existing control system with minimal disruption to building operations

Keep in Touch

© 2019 MPE | Website Design & Development by BEAM Creative Pty. Ltd.